Project Location:
1600 Gateway Blvd., SE, Canton
Description of Work:
Expansion and upgrade of existing CNG Fuel Station. Installation of new concrete equipment and electrical foundation pads. Installation of new primary and secondary electrical service. New primary HDPE natural gas primary service from street to MSA and secondary HDPE and Carbon Steel piping to gas dryer and CNG compressor units. Installed all conduits for secondary power and control wiring and grounding. New high-pressure stainless-steel piping from CNG equipment in compound to 2 new ANGI CNG Dispensers. Installation of 2 new Clean 2.0 CNG 300 HP compressors, PSB gas dryer, storage vessels, priority panel, filter racks and CNG dispensing equipment. New Masonry wall and fencing in compound. Concrete and asphalt site restoration.
Work Performed for: Clean Energy Fuels
Status: Completed May 2023
Value: $697,845.00