Project Location:
633rd Medical Group, Langley AFB Hospital, 77 Nealy Avenue Hampton
Description of Work:
Installed and maintained ICRA Barriers throughout the project. Performed Demolition and equipment removal of existing washer /disinfectors, pass thru window, prep sinks, ultrasonic cleaners. Perform all required site prep wall demolition, installation of new drywall walls for new cart washer mechanical room. Additional site prep performed including mechanical , plumbing and electrical upgrades. Modified steam supply and return piping/valves. Modified hot and cold water piping/valves/gauges. New electrical circuits for new Belimed CS-750 Cart Washer; 3-New Belimed WD290 Washers with Conveyors and Automated Return Gate, 2-New SS Prep Sinks, 2-Ultrasonic Cleaners. Installed new Belimed CS 750-E electric steam cart washer. Installed new SS exhaust duct on cart washer exhaust blower and tied into department duct work. Installed new Floor Sink Drains and New Epoxy Flooring in the Department. Installed new Hot Water Booster Pump and Piping System.
Work Performed for: United States Air Force
Status: Work Completed: May 2023