Clean Energy – SJ Gas/WM New CNG Station

Project Location:

326 Scott Avenue, Woodbine, NJ 08720

Description of Work:

Construction of new CNG Fuel Station. Site work and installation of GeoGrid system to prepare for installation of new concrete equipment and electrical foundation pads. Installation of new primary and secondary electrical service. New primary HDPE natural gas primary service from street to MSA and secondary HDPE and Carbon Steel piping to gas dryer and CNG compressor units. Installed all conduits for secondary power and control wiring and grounding. New high-pressure stainless-steel piping from CNG equipment in compound to the new K-Rail Time Fill Fuel islands and new Fast Fill Posts; Installation of new ANGI NG300 CNG Twin Skid 300 HP compressors, PSB gas dryer, storage vessels, priority panel, filter racks and CNG dispensing equipment. New fencing & bollards in compound. Concrete and asphalt site restoration.

Work Performed for: Clean Energy Fuels
Status: Work Completed: March 2026
Value: $1,265,000

Click on the images below to enlarge.